Challenge:
- Contamination by hydrocarbons.
Solutions:
- Rehabilitation of lagoons over a 400 ha area.
- Treatment of the heaviest fractions by thermal desorption (logistics, design, construction & operation by SARPI Remediation).
- Full on site material recovery.
- Duration: 2 year (2019-2020).